6061-T6 Aluminum Concrete Frame Formwork System For House Building Made in China
Advantages of Aluminum Frame slab formwork system:
1,Easy
It is about 23-25kg/m2, light weight means only a single worker could move the Aluminum Formwork easily.
2,Efficient
The Aluminum Formwork System is jointed by the pin, it is two times fast than wood formwork to install and dismantle,
so it could save more work and work time.
3,Saving
The Aluminum Formwork System supports early-dismantling application, the construction working cycle is 4-5 days per floor,
it is effective for cost saving in human resource and construction management
The Aluminum Formwork can be re-used more than 300 times, the economic cost is very low of every time using.
4,Safety
The Aluminum Formwork system adopts the integrative design, it could load 30-40KN/ m2, which could reduce the safety
loophole leaded by the construction and materials.
5,High quality of construction.
The aluminum formwork is made by extrusion process, it makes the concrete surface flat,smooth. No need heavy backing
plaster, effectively for plaster cost saving.
6,Environment friendly
The aluminum material of the formwork could also be recovered after useless, it avoids the waste.
7, Clean
Different with the wood formwork, there is no wood panel,fragment and other waste in the construction area using the
aluminum formwork.
8, Widely scope of application:
The Aluminum Formwork System is suited for application of walls, beams, floors, windows, columns, etc.
Application Sketch of frame formwork system:
use beam forming support, the biggest pouring height can reach800mm.
add extension for beam forming support, the biggest pouring height can reach1225mm
Aluminum frame formwork Advantage
Light weight
Aluminum frame for the formwork panel is made of aluminum alloy 6061-T6. It is much lighter weight compared
with steel formwork.
Cost Saving
Assembled easily with shoring prop, drop head and panels.
With early Stripping application, the user only need buy one floor of formwork panels and 2 floors of shoring prop,
but can finish two floors with cycle time 7-10 days per floor.
Improve Efficiency
Large forming surface improve construction speed.
Our Service
* Consultancy
Offer you a general idea of formwork & scaffold among TECON various systems, to fit your project demand.
* Technical Planning
Customized forming & shoring solution proposal according to your structural drawing by Auto-cad.
* Order Delivery
From fabrication to loading, fast to your site with standard export packages.
* On-site Supervision
Shop drawing, user manual, and even send our supervisor to your site for training and supervision.
Components of Aluminum Frame Flab formwork System:
Aluminum frame panel | |
Flexible panel
|
|
Top deck bearing | |
Early dismantling bearing
|
|
Plastic tube | |
Steel prop | |
Connecting pin | |
Prop Retainer | |
Aluminum beam | |
connecting frame |